85mq apartment renovation

85mq apartment renovation

Demolitions and disposal: demolition of masonry in perforated and non-perforated bricks, removal of ceramic flooring including screed below, removal of parquet flooring in the rooms, removal of skirting boards, removal of bathroom and kitchen coatings, door dismantling, including possible removal of counter frames and uncoupling of brackets and harpoons, removal of radiators, removal of existing electrical system, removal of sanitary water system for the bathroom and kitchen, removal of sanitary appliances (for bathroom and kitchen) and existing taps, crumbling of previously ceramic-coated walls, dismantling of containers and frames, roller shutter removal. All demolitions include transport charges and disposal in public landfills of the resulting material.

Buildings: supply and installation of screed for laying flooring, supply and installation of Ultraplan Mapei level, formation of new internal panels made of hollow bricks, arch closing with architrave installation, realization of plasterboard false ceiling, creation of masonry shelf above shower, creating a masonry top for countertop or recessed washbasin.

Made in the following materials: two-part whitening in clear single color with emulsified paint, washable water-based paint, on prepared and isolated internal surfaces (entire apartment)

Poses: installation of porcelain stoneware flooring, installation of pre-finished parquet to be glued, installation of porcelain stoneware in the bathrooms, installation of wooden or porcelain stoneware skirting boards (entire apartment excluding bathrooms), laying of doors hinged and sliding, installation of suspended sanitary ware, installation of armored door, installation of trial split with supply of refrigerant gas, installation of new external shutters, Pposa on site of new PVC insulated containers, laying and supply of roller shutters, including roller, motor and electric points.

New Plants: water, electricity and gas

Supply: supply of porcelain stoneware flooring and pre-finished parquet (including scrap and stock), supply of wooden or stoneware skirting boards (including scrap and stock), supply of porcelain stoneware for the bathroom and kitchen (including scrap and stock), supply of sanitary suspended (patronal bath) and sanitary on the ground (bathroom), supply of internal swing doors with frosted or not glass, supply of new armored door, supply of towel warmers, supply of tubular steel radiators, supply of air conditioning system, supply of new PVC boxes for windows, supply of new PVC anti-hail blinds for windows.

Other: whitewashing the cellar and laying the floor with supply and electrical point.

Drafting of procedures for carrying out the work in full compliance with the current legislation: CILA, PSC, preliminary notification to the ASL, report of cadastral variation.

Barbara Moreschi

Graduated in Architecture in 1996 at the Polytechnic of Milan. Registered since January 2003 with the Order of Architects of the Province of Varese. Qualified to carry out the role of Safety Coordinator on construction sites. She works as a freelancer and over the years she has been busy

No reviews yet

Vote for the project

  • SHARE:

fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/clients/435d202f1b9160f3ae871d6fc5971fee/ristrutturazionecase.com/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: # 0 / 435f202f1 / 9160 / clients /ristrutturazionecase.com/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(3): wfWAFStorageFile :: atomicFilePutContents ('/ home / clients / 871 ...' , '<? php exit (' Acc ... ') # 6 [internal function]: wfWAFStorageFile-> saveConfig (' livewaf ') # 5971 {main} thrown in /home/clients/435d202f1b9160f3ae871d6fc5971fee/ristrutturazionecase.com/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35