100mq apartment renovation

100mq apartment renovation

Demolitions and disposal: demolition of masonry in perforated and non-perforated bricks, removal of an existing fireplace, removal of bathroom and kitchen coatings, removal of ceramic flooring including the underlying screed, removal of glued parquet, dismantling of doors, removal of radiators, removal of plumbing fixtures , removal of sanitary water system, partial removal of existing electrical system, crumbling of previously ceramic-coated walls, dismantling of No. 2 external air conditioner motors and internal 3 split, body disassembly, disassembly of external frames. All demolitions include transport charges and disposal in public landfills of the resulting material.

Buildings: supply and installation of screed for laying flooring, supply and installation of Ultraplan Mapei level, construction of existing false ceiling and restoration with plasterboard panels, formation of new internal panels made of perforated bricks, displacement of 3 doors with relative squaring.

Made in the following materials: two-part whitening in clear single color with emulsified paint, washable water-based paint, on prepared and isolated internal surfaces (entire apartment).

Poses: installation of porcelain stoneware flooring, installation of wooden skirting boards, installation of porcelain stoneware in the bathrooms, installation of a glazed glass transom between the two bathrooms, installation of hinged or folding doors, laying of sliding door, supply and installation of internal panel and internal trims of the same finish as the doors, supply and installation of roller shutters, installation of sanitary ware and mixers, installation of new external mosquito nets, installation of new fixtures external.

New Plants: water and electricity

Supply: supply of wooden skirting boards equal to doors, supply of internal swing and sliding doors, supply of towel warmers, supply of aluminum radiators, supply of new mosquito nets, supply of sanitary ware to the ground, supply of new PVC containers for windows, supply of new pvc windows.

Other: drafting of paperwork for the execution of the works in full compliance with the regulations in force: CILA, PSC, preliminary notification to the ASL, report of cadastral variation.

Stefania Romagnoli

He was born in Rome in 1970, after graduating in Architecture, at the "La Sapienza" university in 2000, he began his free profession and in 2005 he founded the BERO Studio in Rome. The professional experience gained in the decade 2005-2015 at inside the Studio BERO is focused

5/5 (1)

Vote for the project

  • SHARE:

fatal error: Uncaught wfWAFStorageFileException: Unable to save temporary file for atomic writing. in /home/clients/435d202f1b9160f3ae871d6fc5971fee/ristrutturazionecase.com/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:35 Stack trace: # 0 / 435f202f1 / 9160 / clients /ristrutturazionecase.com/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(3): wfWAFStorageFile :: atomicFilePutContents ('/ home / clients / 871 ...' , '<? php exit (' Acc ... ') # 6 [internal function]: wfWAFStorageFile-> saveConfig (' livewaf ') # 5971 {main} thrown in /home/clients/435d202f1b9160f3ae871d6fc5971fee/ristrutturazionecase.com/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 35